JERC

Chandigarh


Sr.No. In Matter Of Petitions No Date Of Order Download
1 Petition for approval of Aggregate Revenue Requirement (ARR) for FY 2010-11 for Determination of Tariff (for Distribution and Retail sale of Electricity) of Electricity Department, Chandigarh in terms of Section 62 read with Section 86 (e) of Electricity Act, 2003. Petition No. Petition No.....20/ 2010 24-01-2011
2 Petition for approval for purchase ofpower from proposed solar PV based power plants of NTPC LTD. in Andaman & Nicobar Islands. Petition No. Petition No. 24/2011 09-02-2011
3 Filing of the Tariff Petition for the FY 2011 - 12 Compliance of JERC for the State of Goa and UTs (Terms and Conditions for Determination of Tariff) Regulations, 2009. Petition No. petition no.22/2010 09-02-2011
4 Petition No. 23/2011:Designation of agency as State Agency for accreditation and recommending the renewable energy projects for registration. Compliance of regulation 3.1 of the JERC (Procurement of Renewable Energy) Regulations, 2010. Petition No. Petition No. 23/2011 15-04-2011
5 Petition No. 11/2010:Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon'ble Appellate Tribunal for Electricity Petition No. Petition No. 11/2010 15-04-2011
6 Petition No. 11/2010 : Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon'ble Appellate Tribunal for Electricity. Petition No. Petition No. 11/2010 08-07-2011
7 Petition No. 28/2011:Petition for seeking approval of the Draft Power Purchase Agreement proposed to be entered into by Electricity Wing of Engineering Department with NHPC and already signed PPAs with NTPC. Petition No. Petition No. 28/2011 08-07-2011
8 Petition No. 11/2010:Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon’ble Appellate Tribunal for Electricity. Petition No. Petition No. 11/2010 23-08-2011
9 Petition No. 11/2010: Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon’ble Appellate Tribunal for Electricity. Petition No. Petition No. 11/2010 23-08-2011
10 Petition No. 39/2011: Determination of Tariff for 1.0MW Power from Rooftop PV & Small Solar Power Generation Programme (RPSSGP) for supply to the Pondicherry Distribution Utility by Saheli Export Private Limited, Chennai. Petition No. Petition No. 39/2011 24-08-2011
11 Petition No. 42/2011: Petition for review of tariff order dated 16.07.2011 for ARR & retail tariff for the UT of Chandigarh for the FY 2011-12. Petition No. Petition No. 42/2011 27-09-2011
12 Petition No. 52/2011: Petition seeking approval for the Power Purchase Agreement entered into with M/S NTPC Petition No. Petition No. 52/2011 24-10-2011
13 Petition No. 46/2011: Petition for seeking approval for the draft Power Purchase Agreement proposed to be entered into by Electricity Department Chandigarh with NTPC for Feroze Gandhi Unbchar Thermal Power Station Stage -IV Petition No. Petition No. 46/2011: 17-01-2012
14 Petition No. 75/2012 : Standard of Performance (SOP) Non-submission of monthly /quarterly and annual report Petition No. Petition No. 75/2012 21-06-2012
15 Petition No. 77/2012 : Status of Consumer metering, Reading and Billing category wise. Petition No. Petition No. 77/2012 21-06-2012
16 Petition No. 78/2012 : Operationalization of Open Access Petition No. Petition No. 78/2012 22-06-2012
17 Petition No. 76/2012 : Loss reduction Programme Petition No. Petition No. 76/2012 22-06-2012
18 Petition No. 78/2012 : Operationalization of Open Access Petition No. Petition No. 78/2012 22-06-2012
19 Petition No. 11/2011 : Establishment of Consumer Grievance Redressal Forum. Petition No. Petition No. 11/2011 26-06-2012
20 Petition No. 84/2012 : Removal of difficulty in the matter of interpretation of Regulation 10.1(2) (i) of Joint Electricity Regulatory Commission ( Electricity Supply Code) Regulations 2010 in view of orders passed by Consumers Grievances Redressal Forum Chandigarh. Petition No. Petition No. 84/2012 11-09-2012
21 Petition No. 80/2012 : Petition for review of order dated 7th May, 2012 passed by Joint Electricity Regulatory Commission for State of Goa and Union Territories in petition no. 64 of 2012 filed by Electricity Department Union Territory of Chandigarh for approval of ARR and Tariff Determination for FY 2012-13. Petition No. Petition No. 80/2012 11-09-2012
22 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. Petition No. Petition No. 68/2012 26-11-2012
23 Petition No. 75/2012 : Standard of Performance (SOP) Non-submission of monthly / quarterly and annual report. Petition No. Petition No. 75/2012 30-01-2013
24 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. Petition No. Petition No. 68/2012 30-01-2013
25 Petition No. 78/2012 : Operationalisation of Open Access in power sector as per JERC Regulations Petition No. Petition No. 78/2012 19-02-2013
26 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections Petition No. Petition No. 68/2012 27-02-2013
27 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections Petition No. Petition No. 68/2012 17-04-2013
28 Petition No. 78/2012 : Operationalisation of Open Access in power sector as per JERC Regulations Petition No. Petition No. 78/2012 30-04-2013
29 Petition No. 77/2012 : Consumer metering, reading and billing category wise Petition No. Petition No. 77/2012 27-05-2013
30 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. Petition No. Petition No. 68/2012 14-06-2013
31 Petition No. 78/2012 : Operationalisation of Open Access in power sector as per JERC Regulations. Petition No. Petition No. 78/2012 08-07-2013
32 Petition No. 76/2012 : Loss reduction programme. Petition No. Petition No. 76/2012 10-07-2013
33 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. Petition No. Petition No. 68/2012 05-08-2013
34 Petition No. 76/2012 : Loss reduction programme Petition No. Petition No. 76/2012 25-10-2013
35 Petition No. 110/2013 : Petition under sections 61, 62, 86 and 181 of the Electricity Act, 2003 read with Joint Electricity Regulatory Commission for Goa and Union Territories (Procurement of Renewable Energy) Regulations, 2010 for seeking determination of preferential Tariff under Net Metering for Rooftop Solar Photovoltaic Power Project of Chandigarh Renewal Energy Science & Technology Promotion Society (CREST) and for sale of such power to the Electricity Department of UT of Chandigarh. Petition No. Petition No. 110/2013 25-10-2013
36 Petition No. 11/2011 : Establishment of Consumer Grievance Redressal Forum. Petition No. Petition No. 11/2011 29-10-2013
37 Petition No. 11/2011 : Establishment of Consumer Grievance Redressal Forum. Petition No. Petition No. 11/2011 29-10-2013
38 Petition No. 115/2013 : Petition against demand of ACD by Electrcity Department UT -Chandigarh Petition No. Petition No. 115/2013 13-11-2013
39 Petition No. 116/2013 : Petition under Section 86 of the Electricity Act, 2003 for relaxation in Regulation 6.10 (3) of Joint Electricity Regulatory Commission for Goa and UTs (Electricity Supply Code) Regulations, 2010, quash public notice dated 10.10.2013 issued by Electricity Department UT Chandigarh for deposit of advance consumption, direction to ED- UT Chandigarh to pay interest at the rate of 18% per annum on security deposit and direct the respondent ED- UT Chandigarh to frame a policy regarding installation of prepaid meters Petition No. Petition No. 116/2013 20-11-2013
40 Petition No. 110/2013 : Petition under sections 61, 62, 86 and 181 of the Electricity Act, 2003 read with Joint Electricity Regulatory Commission for Goa and Union Territories (Procurement of Renewable Energy) Regulations, 2010 for seeking determination of preferential Tariff under Net Metering for Rooftop Solar Photovoltaic Power Project of Chandigarh Renewal Energy Science & Technology Promotion Society (CREST) and for sale of such power to the Electricity Department of UT of Chandigarh. Petition No. Petition No. 110/2013 01-06-2013
41 Petition No. 76/2012 : Loss Reduction Programme as per Regulation 15 of JERC for the State of Goa and UTs (terms and Conditions for determination of tariff Regulations, 2009 Petition No. Petition No. 76/2012 06-01-2014
42 Petition No. 110/2013 : Petition under sections 61, 62, 86 and 181 of the Electricity Act, 2003 read with Joint Electricity Regulatory Commission for Goa and Union Territories (Procurement of Renewable Energy) Regulations, 2010 for seeking determination of preferential Tariff under Net Metering for Rooftop Solar Photovoltaic Power Project of Chandigarh Renewal Energy Science & Technology Promotion Society (CREST) and for sale of such power to the Electricity Department of UT of Chandigarh. Petition No. Petition No. 110/2013 06-01-2014
43 Petition No. 76/2012 : Loss Reduction Programme as per Regulation 15 of JERC for the State of Goa and UTs (terms and Conditions for determination of tariff Regulations, 2009 Petition No. Petition No. 76/2012 05-05-2014
44 Petition No. 132/2014 : Petition for seeking extension of time for the implementation of directions passed vide order dated 11.02.2014 in petition no. 127/2014. a) Framing of software and policy for pre-paid meters b) Acceptance of security deposit in form of Bank Guarantee. c) To pay interest at bank rate on the amount of security deposit / ACD charges from the date of commencement of Electricity Act, 2003. Petition No. Petition No. 132/2014 22-05-2014
45 Petition No. 133/2014 : Petition for review of Order dated 11.04.2014 passed by JERC in petition no. 110/2014 filed by Chandigarh Renewable Energy Science & Technology Promotion Society (CREST) for determination of preferential tariff under Net Metering for rooftop solar photovoltaic power projects of CREST for sale of such power to Electricity Department UT-Chandigarh Petition No. Petition No. 133/2014 24-06-2014
46 Petition No. 134/2014 : Filing of petition for seeking orders / directions providing regulatory framework on LT Connectivity and Net Metering for Solar Photovoltaic Power Plants in Chandigarh under Sections 86 and 181 of the Electricity Act, 2003 and as per Joint Electricity Regulatory Commission for State of Goa & Union Territories (Procurement of Renewable Energy) Regulations, 2010. Petition No. Petition No. 134/2014 24-06-2014
47 Petition No. 129/ 2014 :Petition in respect of detailed study on manpower requirement at Chandigarh Electricity Department. Petition No. Petition No. 129/ 2014 24-06-2014
48 Petition No. 136/ 2014 :Review petition against the order dated 11.04.2014 passed by Hon’ble JERC. Petition No. Petition No. 136/ 2014 09-07-2014
49 Petition No. 133/2014 : Petition for review of Order dated 11.04.2014 passed by JERC in petition no. 110/2014 filed by Chandigarh Renewable Energy Science & Technology Promotion Society (CREST) for determination of preferential tariff under Net Metering for rooftop solar photovoltaic power projects of CREST for sale of such power to Electricity Department UT-Chandigarh Petition No. petition no.133/2014 21-08-2014
50 Petition No. 141/ 2014 :Petition for review of Order dated 24.06.2014 passed by Joint Electricity Regulatory Commission for the State of Goa and Union Territories in petition No. 129/2014 Petition No. petition no.141/2014 15-08-2014
51 Petition No. 61/2012 : Compliance of Joint Electricity Regulatory Commission for the State of Goa and UTs (Procurement of Renewable Energy) Regulation 2010 regarding Renewable Purchase Obligation (RPO). Petition No. petition no.61/2012 12-11-2014
52 Petition No. 141/ 2014 :Petition for review of Order dated 24.06.2014 passed by Joint Electricity Regulatory Commission for the State of Goa and Union Territories in petition No. 129/2014. Petition No. petition no.141/2014 13-11-2014
53 Petition No. 149/2014 : Petition for Extension of time under Clause 82 of JERC (Conduct of Business) Regulations, 2009 for compliance of the Joint Electricity Regulatory Commission (for the State of Goa and UTs) Directive Nos. 1 annual statement of accounts and Assets & Depreciation Register. Petition No. petition no.149/2014 15-12-2014
54 Petition No. 141/ 2014 :Petition for review of Order dated 24.06.2014 passed by Joint Electricity Regulatory Commission for the State of Goa and Union Territories in petition No. 129/2014 Petition No. petition no.141/2014 29-12-2014
55 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. petition no.89/2015 16-03-2015
56 Petition No. 171/2015 : Petition for Review of Tariff Order dated 10.04.2015 passed by Joint Electricity Regulatory Commission for the State of Goa and UTs in Petitions No. 163/2015 and 164/2015for FY 2015-16 of Electricity Department, UT Chandigarh Petition No. petition no.171/2015 29-06-2015
57 Petition No. 184/2015 :Petition under Section 86 (1) (f) of Electricity Act, 2003 for directions to the Government of Goa, Respondent to take over the network laid down by the Reliance Infrastructure Limited, Petitioner for supply of electricity to consumers in the area of supply in which the Respondent holds a license under Section 14 of the Electricity Act, 2003 and related matters Petition No. Petition N o. ____ /2016 Date of Order: 25.04.2016 08-01-2016
58 mplementation of Man Power Study Petition No. Petition N o. ____ /2016 Date of Order: 25.04.2016 25-04-2016
59 Petition No. 200/2016 : Petition for Approval of Draft Solar Net Metering Agreement /Gross Metering Power Purchase Agreement (PPA) Petition No. 200/216 13-05-2016
60 Petition No. 201/2016 : Filing of Petition for seeking relief from the restriction on grid penetration upon 30% of the Distribution Transformer Capacity (DTC) for the projects commissioned before the Solar Power-Grid Connected Ground Mounted and Solar Rooftop and Metering Regulations, 2015 came to the existence and also to allow the grid penetration upto atleast 50% of DTC for further projects 2. To allow the net metering of the Solar Power plants without converting its output on to 11 KV side for the projects already commissioned before the Solar Power-Grid Connected Ground Mounted and Solar Rooftop and Metering Regulations, 2015 came to the existence and in cases where the captive consumption is more than the 3-4 times of the solar power generation then in such cases connection of solar power plant on 11 KV side may be dispensed with. Petition No. 201/2016 13-05-2016
61 Implementation of Man Power Study Petition No. Petition No. ____ /2016 Date of Order: 13.05.2016 13-05-2016
62 Petition No. 209/2016, Review Petition in respect of Tariff Order FY 2016-17 dated 28th April, 2016 issued by Hon’ble JERC for the UT Chandigarh Petition No. Petition No. 209/2016 Date of Order: 26.07.2016 26-07-2016
63 Petition No. 216/2016 :Petition in respect of load forecasting study alongwith preparation of action plan for short term (2-5 years), medium term 7- 10 years and long term period 15-25 years at ED, Chandigarh Petition No. 216/2016 16-09-2016
64 Petition No. 219/2016 : Petition for seeking approval of Capital Expenditure for Smart Grid Project under National Smart Grid Mission- Rs.28.58 Crores. Petition No. 219/2016 08-11-2016
65 Petition No. 219/2016 : Petition for seeking approval of capital expenditure of Rs. 28.58 Crores for Smart Grid Project under National Smart Grid Mission. Petition No. 219/2016 17-01-2017
66 Petition No.220/2016 : Petition to JERC for Seeking approval of capital expenditure for Rough Cost Estimate for Conversion of existing overhead HT/LT lines into underground system and replacement /augmentation of equipments of 11KV I/D S/Stns., including street Light System in Sector- 8 UT Chandigar Petition No. Petition No. 220/2016 Date of Hearing: 17.01.2017 Date of Order: 13.02.2017 17-01-2017
67 Petition No. 239/2017 : Review Petition in respect of Tariff Order for FY 2017-18 dated 4th May, 2017 issued by the JERC for the Electricity Department, UT Chandigarh Petition No. 239/2017 04-09-2017
68 CORRIGENDUM: Tariff order dated 04 May 2017 for determination of tariff for the FY 2017-18, Annual Performance Review for FY 2016-17 and True-up of the FY 2015-16 in respect of Chandigarh Electricity Department (CED) in Petition No. 229/2017 Petition No. 229/2017 28-09-2017
69 Petition No. 252/2018: Petition to allow as a special case in which Solar Power generated at Water Works, Sector-39, Chandigarh shall be fed to the grid in Gross Metering arrangement but the billing is to be carried out in Net Metering mode thereby total generated solar energy will be provided to DISCOM in the Grid and the same shall be adjusted against total electricity consumption imported from DISCOM by the Municipal Corporation, U.T. Chandigarh in all it's establishments located in Chandigarh, as per Group Net Metering mode. Petition No. Review Petition No. 252/2018 Date of Admission: 05.01.2018 Date of Hearing: 13.02.2018 Date of Order: 04.06.2018 13-02-2018
70 Petition no. 257/2018 Petition seeking review of Commission's Order dated 28th March, 2018 for approval of True-up of the FY 2016-17, APR for the FY 2017-18 and ARR and Tariff Proposal for the FY 2018-19 Petition No. Review Petition No. 257/2018 Date of Hearing: 26.06.2018 Date of Order: 05.09.2018 26-06-2018
71 Order Petition No.14/2019:Power Sale Agreement for Sale of 40 MW Wind Power on Long Term Basis. Petition No. Petition No. 14/2019 Date of Hearing: 16th March 2020 Date of Order: 06-10-2020 16-03-2020
72 Order Petition No. 14/2019: Power Sale Agreement for sale of 40 MW Wind Power on Long Terrm Basis Petition No. 14/2019 16-03-2020
73 Order Petition No. 28/2019: Power Sale Agreement (PSA) for Sale of 50 MW Wind Power on Long Term Basis. Petition No. petition No.28/2019 18-06-2020
74 Order Petition No. 32/2020: Petition for approval of business framework for installation of Grid Connected Rooftop (GCRT) Power Projects for domestic Consumers by third party under Renewable Energy Services Company (RESCO) Built Operate Transfer (BOT) business model as per the provisions of JERC (Solar PV Grid Interactive System based on Net Metering) Regulations, 2019, Para 5 (iii). Petition No. petition No.32/2020 12-10-2020
75 INTERIM ORDER Petition No. 58/2021: Petition for approval of business model framework for installation of Grid Connected Rooftop (GCRT) Power Projects for domestic consumers by third party under Renewable Energy Services Company (RESCO) Built Operate Transfer (BOT) business model as per the provisions of Joint Electricity Regulatory Commission for the State of Goa and Union Territories (Solar PV Grid Interactive System based on Net Metering) Regulations, 2019, Para 5(iii). Petition No. Petition No 5 nF/20228 Date of Hearing 02n 5024 520222 Date of Interim Order 88 5024 520222 05-04-2022
76 GENERAL ORDER Petition No. GENERAL ORDER 02-08-2022
77 Order Petition No. 58/2021:Petition for approval of business model framework for installation of Grid Connected Rooftop (GCRT) Power Projects for domestic consumers by third party under Renewable Energy Services Company (RESCO) Built Operate Transfer (BOT) business model as per the provisions of Joint Electricity Regulatory Commission for the State of Goa and Union Territories (Solar PV Grid Interactive System based on Net Metering) Regulations, 2019, Para 5(iii). Petition No. petition No.58/2021 23-06-2022
78 Order Suo Moto Petition No. 61/2012: Compliance of Joint Electricity Regulatory Commission (For the state of Goa and Union Territories) (Procurement of Renewable Energy) Regulations, 2010 regarding Renewable Purchase Obligation (RPO) and as amended from time to time. Petition No. suo moto petition no.61/2012 30-11-2022
79 INTERIM ORDER: Petition No. 107/2023: Petition Under Regulation 79 of the Joint Electricity Regulatory Commission (Conduct of Business) Regulations, 2009, and all other enabling provisions in this regard, seeking clarification of the Tariff Order dated 30.03.2023, passed in Petition No. 99/2023, for inclusion of captive charging station for charging of E-Buses hired by CTU for public transport and other similarly situate captive charging stations in the tariff category of “Electric Vehicle Charging Station”. Petition No. petition No.107/2023,Date of Hearing 10.10.2023,Date of order 11/10/2023 10-10-2023
80 INTERIM ORDER Petition No. 61/2012: Compliane of the Joint Electricity Regulatory Commission (for the State of Goa & Union Territories) (Procurement of Renewable Energy) Regulations, 2010 regarding Renewable Purchase Obligation (RPO) and as amended from time to time. Petition No. Petition No.77/2012 21-11-2023
81 INTERIM ORDER Petition No. 77/2012 Status of Consumer Metering and billing as per Regulation 8 of the Joint Electricity Regulatory Commission (for the State of Goa & Union Territories) (Electricity Supply Code) Regulation, 2018 and as amended from time to time. Petition No. Petition No.77/2012,Date of Hearing 7.11.2023,Date of Order 10/11/2023 21-11-2023
82 lorem Petition No. 782 15-05-2018
83 lorem Petition No. 787 03-05-2016