Sr.No. In Matter Of Petitions No Date Of Order Download
1 Settlement of long pending issues/payments with Electricity Department Andaman & Nicobar Administration Petition No. O.P. (SR) No. 2 of 2009 03-09-2009
2 Petition under Section 86 (1)(f) of the Electricity Act, 2003 for direction to the respondents to pay the long standing dues/for settlement of long pending issues/payments Petition No. Petition under Section 86 (1)(f) of the Electricity Act, 2003 for direction to the respondents to pay the long standing dues/for settlement of long pending issues/payments 09-12-2009
3 Petition under Section 86 (1)(f) of the Electricity Act, 2003 for direction to the respondents to pay the long standing dues/for settlement of long pending issues/payments Petition No. petitin no.07/2009 28-01-2010
4 Petition under Section 86 (1)(f) of the Electricity Act, 2003 for direction to the respondents to pay the long standing dues/for settlement of long pending issues/paymen Petition No. JOINT ELECTRICITY REGULATORY COMMISSION FOR THE STATE OF GOA AND UNION TERRITORIES, GURGAON Coram Dr. V. K. Garg, Chairperson Shri R. K. Sharma, FIE Member Petition No. 7 /2009 With IA No. /2009 23-02-2010
5 Petition under Section 86 (1)(f) of the Electricity Act, 2003 for direction to the respondents to pay the long standing dues/for settlement of long pending issues/payments Petition No. Petition No. 07 /2009 With IA No. 01/2009 23-03-2010
6 Petition under Section 86 (1)(f) of the Electricity Act, 2003 for direction to the respondents to pay the long standing dues/for settlement of long pending issues/payments Petition No. petition no.07/2010 14-06-2010
7 Petition under Section 86 (1)(f) of the Electricity Act, 2003 for direction to the respondents to pay the long standing dues/for settlement of long pending issues/payments Petition No. Petition No. 7/2009 12-07-2010
8 Petition for approval for purchase ofpower from proposed solar PV based power plants of NTPC LTD. in Andaman & Nicobar Islands. Petition No. Petition No. 24/2011 09-02-2011
9 Filing of the Tariff Petition for the FY 2011 - 12 Compliance of JERC for the State of Goa and UTs (Terms and Conditions for Determination of Tariff) Regulations, 2009. Petition No. petition no.22/2010 09-02-2011
10 Petition No. 23/2011:Designation of agency as State Agency for accreditation and recommending the renewable energy projects for registration. Compliance of regulation 3.1 of the JERC (Procurement of Renewable Energy) Regulations, 2010. Petition No. Petition No. 23/2011 15-04-2011
11 Petition No. 11/2010:Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon'ble Appellate Tribunal for Electricity Petition No. Petition No. 11/2010 15-04-2011
12 Petition No. 11/2010 : Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon'ble Appellate Tribunal for Electricity. Petition No. Petition No. 11/2010 08-07-2011
13 Petition No. 11/2010:Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon’ble Appellate Tribunal for Electricity. Petition No. Petition No. 11/2010 23-08-2011
14 Petition No. 11/2010: Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon’ble Appellate Tribunal for Electricity. Petition No. Petition No. 11/2010 23-08-2011
15 Petition No. 11/2011: Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon'ble Appellate Tribunal for Electricity Petition No. Petition No. 11/2011 18-10-2011
16 Petition No. 75/2012 : Standard of Performance (SOP) Non-submission of monthly /quarterly and annual report Petition No. Petition No. 75/2012 21-06-2012
17 Petition No. 77/2012 : Status of Consumer metering, Reading and Billing category wise. Petition No. Petition No. 77/2012 21-06-2012
18 Petition No. 78/2012 : Operationalization of Open Access Petition No. Petition No. 78/2012 22-06-2012
19 Petition No. 76/2012 : Loss reduction Programme Petition No. Petition No. 76/2012 22-06-2012
20 Petition No. 78/2012 : Operationalization of Open Access Petition No. Petition No. 78/2012 22-06-2012
21 Petition No. 11/2011 : Establishment of Consumer Grievance Redressal Forum. Petition No. Petition No. 11/2011 26-06-2012
22 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. Petition No. Petition No. 68/2012 26-11-2012
23 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. Petition No. 89/2012 15-01-2015
24 Petition No. 75/2012 : Standard of Performance (SOP) Non-submission of monthly / quarterly and annual report. Petition No. Petition No. 75/2012 30-01-2013
25 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. Petition No. Petition No. 68/2012 30-01-2013
26 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. Petition No. 89/2012 31-01-2013
27 Petition No. 93/2013 : Petition for approval of Power Purchase Agreement (PPA) between Electricity Department, Andaman & Nicobar Administration, and NTPC Ltd. Petition No. Petition No. 93/2013 05-02-2013
28 Petition No. 78/2012 : Operationalisation of Open Access in power sector as per JERC Regulations Petition No. Petition No. 78/2012 19-02-2013
29 Petition No. 97/2013 : Petition for adjudication of disputes between M/s Suryachkra Power Crporation- a power generating company Limited and Electricity Department Andaman & Nicobar Islands -a Distribution Licensee under Regulation 65 of JERC ( Conduct of Business) Regulations,2009 and Section 86 (1) (f) of the Electricity Ac Petition No. Petition No. 97/2013 26-02-2013
30 Petition No. 93/2013 : Petition for approval of Power Purchase Agreement (PPA) between Electricity Department, Andaman & Nicobar Administration, and NTPC Ltd. Petition No. Petition No. 93/2013 26-02-2013
31 Petition No. 94/2013 : Petition for approval of Power Purchase Agreement (PPA) between Electricity Department, Andaman & M/s Suryachakra Green Fuel Pvt. Ltd. under section 86(1) (b) of Electricity Act, 2003. Petition No. Petition No. 94/2013 26-02-2013
32 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections Petition No. Petition No. 68/2012 27-02-2013
33 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. Petition No. 89/2012 12-03-2013
34 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. Petition No. 89/2012 20-03-2013
35 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. Petition No. 89/2012 02-04-2013
36 Petition No. 93/2013 : Petition for approval of Power Purchase Agreement (PPA) between Electricity Department, Andaman & Nicobar Administration, and NTPC Ltd Petition No. Petition No. 93/2013 17-04-2013
37 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections Petition No. Petition No. 68/2012 17-04-2013
38 Petition No. 94/2013 : Petition for approval of Power Purchase Agreement (PPA) between Electricity Department, Andaman & M/s Suryachakra Green Fuel Pvt. Ltd. under section 86(1) (b) of Electricity Act, 2003. Petition No. Petition No. 94/2013 17-04-2013
39 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. Petition No. 89/2012 17-04-2013
40 Petition for approval of agreement for hiring of 10 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s Sudhir Ready Genset Consortium under section 86 (1) (b) of Electricity Act, 2003. Petition No. Order 30-04-2013
41 Petition for approval of agreement for hiring of 10 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s Sudhir Ready Genset Consortium under section 86 (1) (b) of Electricity Act, 2003. Petition No. 7589-80/19/03/2013 30-04-2013
42 Petition No. 78/2012 : Operationalisation of Open Access in power sector as per JERC Regulations Petition No. Petition No. 78/2012 30-04-2013
43 Petition No. 77/2012 : Consumer metering, reading and billing category wise Petition No. Petition No. 77/2012 27-05-2013
44 Petition for approval of agreement for hiring of 5 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s New Bharat Engineering, Navi Mumbai under section 86 (1) (b) of Electricity Act, 2003. Petition No. Order 14-06-2013
45 Petition for approval of agreement for hiring of 10 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s Sudhir Ready Genset Consortium under section 86 (1) (b) of Electricity Act, 2003. Petition No. Order section 83 14-06-2013
46 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. Petition No. Petition No. 68/2012 14-06-2013
47 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. Petition No. 89/2012 14-06-2013
48 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. Petition No. 89/2012 26-06-2013
49 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. Petition No. 89/2012 26-06-2013
50 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. Petition No. 89/2012 26-06-2013
51 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. Petition No. 89/2012 26-06-2013
52 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. Petition No. 89/2012 26-06-2013
53 Petition No. 78/2012 : Operationalisation of Open Access in power sector as per JERC Regulations. Petition No. Petition No. 78/2012 08-07-2013
54 Petition No. 76/2012 : Loss reduction programme. Petition No. Petition No. 76/2012 10-07-2013
55 Petition for approval of agreement for hiring of 5 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s New Bharat Engineering, Navi Mumbai under section 86 (1) (b) of Electricity Act, 2003 Petition No. Order 22-07-2013
56 Petition for approval of agreement for hiring of 10 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s Sudhir Ready Genset Consortium under section 86 (1) (b) of Electricity Act, 2003. Petition No. Order 22-07-2013
57 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. Petition No. Petition No. 68/2012 05-08-2013
58 Petition for approval of agreement for hiring of 5 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s New Bharat Engineering, Navi Mumbai under section 86 (1) (b) of Electricity Act, 2003. Petition No. Order22/07/2013 22-08-2013
59 etition for approval of agreement for hiring of 10 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s Sudhir Ready Genset Consortium under section 86 (1) (b) of Electricity Act, 2003. Petition No. Order 22-08-2013
60 Petition No. 108/2013 : Review petition under Regulation 74 read with Regulation 12 of JERC ( Conduct of Business) Regulations, 2009 of order dated 3.07.2013 passed by this Commission in petition no. 89/2013 for fixation of completed / actual capital cost bof project and Tariff of the project of the petitioner -a Power Generating Company. Petition No. Petition No. 108/2013 19-09-2013
61 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. Petition No. 89/2012 19-09-2013
62 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. Petition No. 89/2012 19-09-2013
63 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. Petition No. 89/2012 19-09-2020
64 Petition No. 109/2013 : Review Petition under Section 94 of the Electricity Act, 2003 of Order dated 3.07.2013 passed by this Commission in petition no. 89/2013 for fixation of completed / actual capital cost and Tariff of the project of the petitioner - Power Generating Company Petition No. Petition No. 109/2013 19-09-2013
65 Petition for approval of agreement for hiring of 5 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s New Bharat Engineering, Navi Mumbai under section 86 (1) (b) of Electricity Act, 2003. Petition No. Date of order 07/10/2013 07-10-2013
66 Petition for approval of agreement for hiring of 10 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s Sudhir Ready Genset Consortium under section 86 (1) (b) of Electricity Act, 2003. Petition No. Date of Ordern07/10/2013 07-10-2013
67 Petition No. 76/2012 : Loss reduction programme Petition No. Petition No. 76/2012 25-10-2013
68 Petition No. 11/2011 : Establishment of Consumer Grievance Redressal Forum. Petition No. Petition No. 11/2011 29-10-2013
69 Petition No. 11/2011 : Establishment of Consumer Grievance Redressal Forum. Petition No. Petition No. 11/2011 29-10-2013
70 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. Petition No. 89/2012 30-10-2013
71 Petition No. 118/2013 : Petition for approval of agreement for hiring of 5 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s New Bharat Engineering, Navi Mumbai under section 86 (1) (b) of Electricity Act, 2003. Petition No. Petition No. 118/2013 13-11-2013
72 Petition for approval of agreement for hiring of 10 MW DG Capacity between Electricity Department, Andaman & Nicobar Administration and M/s Sudhir Ready Genset Consortium under section 86 (1) (b) of Electricity Act, 2003. Petition No. petition no.117/2013 13-11-2013
73 Petition No. 111/2013 : Petition for approval of agreement between Electricity Department, Andaman & Nicobar Administration and M/s Mona Generator Service Pvt. Ltd., New Delhi for procurement of power by hiring of 40-65 KW Capacity DG under section 86 (1) of Electricity Act, 2003. Petition No. Petition No. 111/2013 20-11-2013
74 Petition No. 112/2013 : Petition for approval of agreement between Electricity Department, Andaman & Nicobar Administration and M/s Tractor India Pvt. Ltd., Kolkata for procurement of power by hiring of 1 MW Capacity DG, under section 86 (1) of Electricity Act, 2003. Petition No. Petition No. 112/2013 20-11-2013
75 Petition No. 76/2012 : Loss Reduction Programme as per Regulation 15 of JERC for the State of Goa and UTs (terms and Conditions for determination of tariff Regulations, 2009 Petition No. Petition No. 76/2012 06-01-2014
76 Petition No. 76/2012 : Loss Reduction Programme as per Regulation 15 of JERC for the State of Goa and UTs (terms and Conditions for determination of tariff Regulations, 2009 Petition No. Petition No. 76/2012 05-05-2014
77 Petition No. 61/2012 : Compliance of Joint Electricity Regulatory Commission for the State of Goa and UTs (Procurement of Renewable Energy) Regulation 2010 regarding Renewable Purchase Obligation (RPO). Petition No. petition no.61/2012 12-11-2014
78 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. petition no.89/2012 12-01-2015
79 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. petition no.89/2012 10-02-2015
80 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. petition no.169/2012 23-02-2015
81 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. petition no. 89/2012 16-03-2015
82 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. petition no.89/2015 16-03-2015
83 Petition No. 207/2016, Petition under Section 61 and 62 of the Electricity Act, 2003 for approval of Implementation of DSM based Efficient Lighting Programme (DELP) in the Circle of operation of Electricity Department, Andaman & Nicobar under Demand Side Management Programme Petition No. 207/2016 14-07-2016
84 Petition No. 207/2016, Petition under Section 61 and 62 of the Electricity Act, 2003 for approval of Implementation of DSM based Efficient Lighting Programme (DELP) in the Circle of operation of Electricity Department, Andaman & Nicobar under Demand Side Management Programme Petition No. Petition No. 207/2016 Date of Order: 26.07.2016 26-11-2016
85 Petition No. 208/2016 Petition for approval of tariff of 1MW Grid connected Roof-top Solar PV project in Andaman & Nicobar Islands under Section 62 and 83(4) of the EA, 2003 and under regulation 21,57,58,59 and 60 of the JERC (Solar Power Grid Connected Ground Mounted and Solar Rooftop and Metering) Regulations, 2015. Petition No. 208/2016 26-08-2016
86 Petition No. 212/ 2016 :Petition under section 61 (h) , 62, 64 read with section 86 (1) (a) , 86 (1) (b) and 86 (1) (e) of the Electricity Act, 2003 for determination of project Specific tariff for sale of power to ED of A&N in 1.125MW Renewable wave Energy project. Petition No. 212/2016 30-08-2016
87 Petition No. 213, 214, 215 /2016 : Determination of tariff for Procurement of Power by Distribution Company/Licensees from Biomass based Power Generating Company in the UT of A&N Islands using the Gasification route (Otto Cycle). 1.Mithakhari Industrial Area, Port Blair, Sourth Andaman District. Petition No. Petition No. 213/2016 Date of Order: 16.09.2016 16-09-2016
88 Petition No. 174 /2015 : Complaint under Section 142 of the Electricity Act, 2003 read with Regulation 70 of the Joint Electricity Regulatory Commission for the State of Goa and Union Territories (Conduct of business) Regulations, 2009 Petition No. 174/2015 17-11-2017
89 Petition No. 174/2015 :Complaint under Section 142 of the Electricity Act, 2003 read with Regulation 70 of the Joint Electricity Regulatory Commission for the State of Goa and Union Territories (Conduct of business) Regulations, 2009. Petition No. 174/2015 24-11-2016
90 Petition No. 174/2015 :Complaint under Section 142 of the Electricity Act, 2003 read with Regulation 70 of the Joint Electricity Regulatory Commission for the State of Goa and Union Territories (Conduct of business) Regulations, 2009. Petition No. 175/2015 29-11-2016
91 Petition No. 174/2015 - Complaint under Section 142 of the Electricity Act, 2003 read with Regulation 70 of the Joint Electricity Regulatory Commission for the State of Goa and Union Territories (Conduct of Business ) Regulations, 2009 Petition No. Petition no. 174 of 2015 Date of Order 13.01.2017 13-01-2017
92 Petition No. 236/2017 : The Review Petition filed under Section 94 of the Electricity Act, 2003 read with Regulation 74 of the Joint Electricity Regulatory Commission for the State of Goa and Union Territories (Conduct of Business) Regulation, 2009 Petition No. 236/2017 22-06-2017
93 Petiton No. 242/2017: Petition for approval of agreement for "hiring of 1 x 750 KVA DG Set as Standby Power House at the Secretariat Complex" between Electricity Department, Andaman & Nicobar Administration and M/s Mona Generator Services (P) Ltd. Petition No. petition No.242/2017 10-10-2017
94 Petition No. 243/2017: Petition for approval of Agreement for Procurement of Power by hiring a DG Power Plant to deliver 5 MW power continuously to 33 Grid of the ED, Andaman & Nicobar Administration at Port Blair between the Electricity Department, Andaman & Nicobar Administration and M/s New Bharat Engineering Works, Navi Mumbai Petition No. 243/2017 21-12-2017
95 Petition No. 244/2017: Petition for approval of Agreement for Procurement of Power by hiring DG Set to deliver 10 MW power continuously to 33 KV grid to the ED, Andaman & Nicobar Administration at Port Blair between the ED, Andaman & Nicobar Administration and M/s Sudhir Ready Gensets Consortium, New Delhi Petition No. petition No.244/2017 21-12-2017
96 Petition No. 253/2018: Petition under Section 83 read with Section 63 and other applicable provisions of the Electricity Act, 2003 for directions. Petition No. 253/2018 22-01-2018
97 Order review Petition no. 31/2020:Petition under Regulation 74 of the JERC (Conduct of Business) Regulations, 2009 read with Section 94(1)(f), Electricity Act, 2003 seeking Review of Tariff Order dated 18.05.2020 passed by this Hon’ble Commission in the Petition No. 23 of 2019 for approval of True – up of FY 2016-17 & ARR and determination of Retail Supply Tariff for the FY 2020-21 Petition No. Review Petition No. 31/2020 Date of Hearing: 09.09.2020 Date of Order: 02.12.2020 09-09-2020
98 Order Petition No. 30/2020:Petition under Regulation 74 of the JERC (Conduct of Business) Regulations, 2009 read with Section 94(1)(f), Electricity Act, 2003 seeking Review of Tariff Order dated 20.05.2019 passed by this Hon’ble Commission in the Petition No. 274/2019 for approval of True up of FY 2015-16 & ARR for 2 nd MYT Control Period (FY 2019-20 to FY 2021-22) & determination of Retail supply Tariff for the FY 2019-20. Sea Shell Hotels & Resorts adn TSG Hotel and Resorts V/S. SE, Andaman & Nicobar Islands Petition No. petition No.30/2020 09-09-2020
99 Petition No. 54/2021-Petition under Section 86(1)(b) and 86(1)(e) of the Electricity Act, 2003 for redetermination/ revision of tariff of Grid connected Roof-top Solar PV Projects in Andaman and Nicobar Islands consequent to the revision of the Central Financial Assistance from Ministry of New and Renewable Energy, Government of India. Petition No. petition No.54/2-21 31-08-2021
100 GENERAL ORDER Petition No. GENERAL ORDER 02-08-2022
101 Petition No. 84/2022-Petition for approval of Tariff and procurement of Power from 4MWp Floating Solar Power Plant with 2MW/1MWHr BESS. Petition No. Petition No. 84/2022 Date of Hearing: 18.10.2022 Date of Order: 24.05.2023 18-10-2022
102 INTERIM ORDER Petition No. 84/2022: Petition under Section 86 (1) (b) and (e ) of the Electricity Act, 2003 and Regulation 60 of the JERC (Conduct of Business) Regulations, 2009 and other applicable provisions of the regulations notified by the Hon'ble JERC Petition No. Petition No. 84/2022 Date of Hearing: 18.10.2022 Date of Order: 20.10.2022 18-10-2022
103 Order Suo Moto Petition No. 61/2012: Compliance of Joint Electricity Regulatory Commission (For the state of Goa and Union Territories) (Procurement of Renewable Energy) Regulations, 2010 regarding Renewable Purchase Obligation (RPO) and as amended from time to time. Petition No. suo moto petition no.61/2012 30-11-2022
104 Interim Order Petitin No. 103/2023: Petition under Sections 142 and 146 of the Electricity Act, 2003, for taking action against the Respondent and issuance of appropriate directions in terms thereof, for deliberate contravention of the directions passed by this Hon’ble Commission on 02.12.2020 passed in Review Petition No. 30 of 2020, on 02.12.2020 passed in Review Petition No. 31 of 2020, on 31.05.2021 passed in the Tariff Petition for FY 2021-22 and on 23.08.2021 passed in Review Petition No. 50/2021, along with supporting Affidavit. Petition No. petition No.103/2023 06-06-2023
105 INTERIM ORDER Petition No. 103/2023: Petition under Sections 142 and 146 of the Electricity Act, 2003, for taking action against the Respondent and issuance of appropriate directions in terms thereof, for deliberate contravention of the directions passed by this Hon’ble Commission on 02.12.2020 passed in Review Petition No. 30 of 2020, on 02.12.2020 passed in Review Petition No. 31 of 2020, on 31.05.2021 passed in the Tariff Petition for FY 2021-22 and on 23.08.2021 passed in Review Petition No. 50/2021, along with supporting Affidavit. Petition No. petition No. 103/2023,Date of Hearing 21.09.2023,Date of Order 21.09.2023 21-09-2023
106 INTERIM ORDER Petition No. 77/2012: Status of Consumer Metering and billing as per Regulation 8 of the Joint Electricity Regulatory Commission (for the State of Goa & Union Territories) (Electricity Supply Code) Regulation, 2018 and as amended from time to time Petition No. Petition No.77/2012,Date of Hearing 06/11/2023,Date of Order 06/11/2023 06-11-2023
107 NTERIM ORDER Petition No. 61/2012: Compliane of the Joint Electricity Regulatory Commission (for the State of Goa & Union Territories) (Procurement of Renewable Energy) Regulations, 2010 regarding Renewable Purchase Obligation (RPO) and as amended from time to time. Petition No. petition No.77/2012 21-11-2023
108 lorem Petition No. 782 15-05-2018
109 lorem Petition No. 787 03-05-2016