1 Petition under Section 86 (1)(f) of the Electricity Act, 2003 for direction to the respondents to pay the long standing dues/for settlement of long pending issues/payments Petition No. petition no.19. 01. 10 06-01-2010
2 Seeking the approval of the Hon'ble Commission under regulation 60 (c) of the JERC (Conduct of Business) Regulation 2009, for the Draft Power Purchase Agreement proposed to be entered by the Electricity Department, Government of Puducherry with M/s Neyveli Lignite Corporation Ltd., Neyveli, Tamil Nadu Petition No. Seeking the approval of the Hon'ble Commission under regulation 60 (c) of the JERC (Conduct of Business) Regulation 2009, for the Draft Power Purchase Agreement proposed to be entered by the Electricity Department, Government of Puducherry with M/s Neyveli Lignite Corporation Ltd., Neyveli, Tamil Nadu 04-10-2010
3 Seeking the approval of the Hon'ble Commission under regulation 60 (c) of the JERC (Conduct of Business) Regulation 2009, for the Draft Power Purchase Agreement proposed to be entered by the Electricity Department, Government of Puducherry with M/s Neyveli Lignite Corporation Ltd., Neyveli, Tamil Nadu. Petition No. Petition No.....15/ 2010 19-10-2010
4 Petition for seeking approval of the Commission for passing on the incremental power purchase cost to the approved class of Consumers of Electricity Department, Puducherry. Petition No. Petition No.....19/ 2010 24-01-2011
5 Petition for approval for purchase ofpower from proposed solar PV based power plants of NTPC LTD. in Andaman & Nicobar Islands. Petition No. Petition No. 24/2011 09-02-2011
6 Filing of the Tariff Petition for the FY 2011 - 12 Compliance of JERC for the State of Goa and UTs (Terms and Conditions for Determination of Tariff) Regulations, 2009. Petition No. petition no.22/2010 09-02-2011
7 Petition No. 25/2011: ARR & Tariff Petition of EDP for the year 2009-10 regarding filing of Action Taken Report by June, 2010. Petition No. Petition No. 25/2011 10-03-2011
8 Petition No. 23/2011:Designation of agency as State Agency for accreditation and recommending the renewable energy projects for registration. Compliance of regulation 3.1 of the JERC (Procurement of Renewable Energy) Regulations, 2010. Petition No. Petition No. 23/2011 15-04-2011
9 Petition No. 11/2010:Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon'ble Appellate Tribunal for Electricity Petition No. Petition No. 11/2010 15-04-2011
10 Petition No. 11/2010 : Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon'ble Appellate Tribunal for Electricity. Petition No. Petition No. 11/2010 08-07-2011
11 Petition No. 19/2010:Petition for seeking approval of the Commission for passing on the incremental power purchase Petition No. Petition No. 19/2010 08-07-2011
12 Petition No. 35/2011: Seeking approval under Regulation 62 of JERC(conduct of Business) Regulations,2009, for making investment decision under R-APDRP scheme Part-A Petition No. Petition No. 35/2011 14-07-2011
13 Petition No. 34/2011: Petition for approval to carry forward of renewable purchase obligation (RPO) compliance requirement for the year 2010-11 to the next financial yea Petition No. Petition No. 34/2011 15-07-2011
14 Petition No. 19/2011: Incremental Fuel Surcharge for the period from April,2011 to October,2010 for the Electricity Department Puducherry Petition No. Petition No. 19/2011 12-08-2011
15 Petition No. 11/2010:Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon’ble Appellate Tribunal for Electricity. Petition No. Petition No. 11/2010 23-08-2011
16 Petition No. 11/2010: Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon’ble Appellate Tribunal for Electricity. Petition No. Petition No. 11/2010 23-08-2011
17 Petition No. 11/2011: Establishment of Consumer Grievance Redressal Forums Compliance of Order dated 9.10.2009 of the Hon'ble Appellate Tribunal for Electricity Petition No. Petition No. 11/2011 18-10-2011
18 Petition seeking the approval for Power Purchase Aggrement proposed to be entered into with Project proponents qualifying under JNNSM scheme Petition No. Petition No.....17/ 2010 19-10-2011
19 Petition No. 58/2011: Approval of Aggregate Revenue Requirement for Tariff Proposal for the FY 2011-12. Petition No. Petition No. 58/2011 18-01-2012
20 Petition No. 60/2011: Approval of Aggregate Revenue Requirement for Tariff Proposal for the FY 2012-13. Petition No. Petition No. 60/2011 18-01-2012
21 Petition No. 73/2012 : Seeking advice of the JERC for State of Goa & Union Trritories Commission in the matter relating Corporatization / restruscturing of the Electricity Department, Puducherry Petition No. Petition No. 73/2012 29-05-2012
22 Petition No. 19/2010 : Incremental Fuel Surcharge for the period from April, 2010 to October, 2010 for the Electricity Department Puducherry Petition No. Petition No. 19/2010 29-05-2012
23 Petition No. 19/2010 : Incremental Fuel Surcharge for the period from April, 2010 to October, 2010 for the Electricity Department Puducherry Petition No. Petition No. 19/2010 04-06-2012
24 Petition No. 39/2011 : Petition for determination of tariff for 1.0 MW Power from Roo top PV & Small Solar Power Generation Programme (RPSSGP) for supply to the Puducherry Utility. Petition No. Petition No. 39/2011 07-06-2012
25 Petition No. 19/2010 : Incremental Fuel Surcharge for the period from April, 2010 to October, 2010 for the Electricity Department Puducherry. Petition No. Petition No. 19/2010 11-06-2012
26 Petition No. 75/2012 : Standard of Performance (SOP) Non-submission of monthly /quarterly and annual report Petition No. Petition No. 75/2012 21-06-2012
27 Petition No. 77/2012 : Status of Consumer metering, Reading and Billing category wise. Petition No. Petition No. 77/2012 21-06-2012
28 Petition No. 78/2012 : Operationalization of Open Access Petition No. Petition No. 78/2012 22-06-2012
29 Petition No. 76/2012 : Loss reduction Programme Petition No. Petition No. 76/2012 22-06-2012
30 Petition No. 78/2012 : Operationalization of Open Access Petition No. Petition No. 78/2012 22-06-2012
31 Petition No. 11/2011 : Establishment of Consumer Grievance Redressal Forum. Petition No. Petition No. 11/2011 26-06-2012
32 Petition No. 73/2012 : Seeking advice of the JERC for State of Goa & Union Trritories Commission in the matter relating Corporatization / Restructuring of the Electricity Department, Puducherry Petition No. Petition No. 73/2012 07-09-2012
33 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. Petition No. Petition No. 68/2012 26-11-2012
34 Petition No. 18/2010 & 45/2011: Petition for review of order dated 06.08.2011 passed by the Hon'ble Commission in the matter of determination of tariff for Puducherry Power Corporation Limited (PPCL) Gas Power Station (32.5 MW) for the year FY 2011-12. Petition No. Petition No. 18/2010 & 45/2011 19-12-2012
35 Petition No. 83/2011 : Discrepancy in the information submitted to the Commission & Bureau of Energy Efficiency regarding heat rate Petition No. Petition No. 83/2011 19-12-2012
36 Petition No. 18/2010 & 45/2011: Petition for review of order dated 06.08.2011 passed by the Hon'ble Commission in the matter of determination of tariff for Puducherry Power Corporation Limited (PPCL) Gas Power Station (32.5 MW) for the year FY 2011-12. Petition No. Petition No. 18/2010 & 45/2011 23-01-2013
37 Petition No. 75/2012 : Standard of Performance (SOP) Non-submission of monthly / quarterly and annual report. Petition No. Petition No. 75/2012 30-01-2013
38 Petition No. 39/2011 : Petition for determination of tariff for 1.0 MW Power from Roof top PV & Small Solar Power Generation Programme (RPSSGP) for supply to ED- UT Puducherry. Petition No. Petition No. 39/2011 30-01-2013
39 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. Petition No. Petition No. 68/2012 30-01-2013
40 Petition No. 78/2012 : Operationalisation of Open Access in power sector as per JERC Regulations Petition No. Petition No. 78/2012 19-02-2013
41 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections Petition No. Petition No. 68/2012 27-02-2013
42 Petition No. 18/2010 & 45/2011: Petition for review of order dated 06.08.2011 passed by the Hon'ble Commission in the matter of determination of tariff for Puducherry Power Corporation Limited (PPCL) Gas Power Station (32.5 MW) for the year FY 2011-12. Petition No. Petition No. 18/2010 & 45/2011 27-02-2013
43 Petition No. 39/2011 : Petition for determination of tariff for 1.0 MW Power from Roof top PV & Small Solar Power Generation Programme (RPSSGP) for supply to ED- UT Puducherry. Petition No. Petition No. 39/2011 27-02-2013
44 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections Petition No. Petition No. 68/2012 17-04-2013
45 Petition No. 18/2010 & 45/2011: Petition for review of order dated 06.08.2011 passed by the Hon'ble Commission in the matter of determination of tariff for Puducherry Power Corporation Limited (PPCL) Gas Power Station (32.5 MW) for the year FY 2011-12. Petition No. Petition No. 18/2010 & 45/2011 17-04-2013
46 Petition No. 102/2013 : Review petition under section 94 of the Electricity Act, 2003. Petition No. Petition No. 102/2013 30-04-2013
47 Petition No. 78/2012 : Operationalisation of Open Access in power sector as per JERC Regulations Petition No. Petition No. 78/2012 30-04-2013
48 Petition No. 77/2012 : Consumer metering, reading and billing category wise Petition No. Petition No. 77/2012 27-05-2013
49 Petition No. 102/2013 : Review petition under section 94 of the Electricity Act, 2003 Petition No. Petition No. 102/2013 11-06-2013
50 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. Petition No. Petition No. 68/2012 14-06-2013
51 Petition No. 78/2012 : Operationalisation of Open Access in power sector as per JERC Regulations. Petition No. Petition No. 78/2012 08-07-2013
52 Petition No. 76/2012 : Loss reduction programme. Petition No. Petition No. 76/2012 10-07-2013
53 Petition No. 102/2013 : Review petition under section 94 of the Electricity Act, 2003. Petition No. Petition No. 102/2013 18-07-2013
54 Petition No. 107/2013 : Petition for approval for Commission for executing SCADA/ DMS and Distribution improvement works for Puducherry Town under Part-A and Part- B works of R-APDRP Scheme and exucuting various Transmission system Strengthening works.. Petition No. Petition No. 107/2013 22-07-2013
55 Petition No. 68/2012 : Petition for seeking approval of Application & Agreement Form (A&A) for LT/HT connections. Petition No. Petition No. 68/2012 05-08-2013
56 Petition No. 102/2013 : Review petition under section 94 of the Electricity Act, 2003. Petition No. Petition No. 102/2013 19-09-2013
57 Petition No. 102/2013 : Review petition under section 94 of the Electricity Act, 2003. Petition No. Petition No. 102/2013 29-09-2013
58 Petition No. 76/2012 : Loss reduction programme Petition No. Petition No. 76/2012 25-10-2013
59 Petition No. 11/2011 : Establishment of Consumer Grievance Redressal Forum. Petition No. Petition No. 11/2011 29-10-2013
60 Petition No. 11/2011 : Establishment of Consumer Grievance Redressal Forum. Petition No. Petition No. 11/2011 29-10-2013
61 Petition No. 113/2013 : Deferment of claim of Fuel and Power Purchase Cost Adjustment for the first quarter of the year 2013-14 Petition No. Petition No. 113/2013 29-10-2013
62 Petition No. 102/2013 : Review petition under section 94 of the Electricity Act, 2003. Petition No. Petition No. 102/2013 28-11-2013
63 Petition No. 76/2012 : Loss Reduction Programme as per Regulation 15 of JERC for the State of Goa and UTs (terms and Conditions for determination of tariff Regulations, 2009 Petition No. Petition No. 76/2012 06-01-2014
64 Petition No. 39/2011 : Petition for determination of tariff for 1.0 MW Power from Roof top PV & Small Solar Power Generation Programme (RPSSGP) for supply to ED- UT Puducherry. Petition No. Petition No. 39/2011 21-04-2014
65 Petition No. 128/2014 : Petition for seeking approval for implementation of DSM based Efficient Lightning Program (DELP) in UT of Puducherry under Demand Side Management programme. Petition No. Petition No. 128/2014 25-04-2014
66 Petition No. 76/2012 : Loss Reduction Programme as per Regulation 15 of JERC for the State of Goa and UTs (terms and Conditions for determination of tariff Regulations, 2009 Petition No. Petition No. 76/2012 05-05-2014
67 Petition No. 137/2014 : Petition for review of Tariff Order dated 25.04.2014 passed by the Joint Electricity Regulatory Commission for Goa and UTs for ED- Puducherry in petition no. 125/2014 Petition No. petition no.137/2014 15-07-2014
68 Petition No. 139/2014 : Petition for seeking approval of Joint Electricity Regulatory Commission for State of Goa and UTs for exemption from claiming of FPPCA from Domestic Consumers category for Quaters I and II of the Financial Year 2013-14 by providing subsidy by the Government of Puducherry. Petition No. petition no.139/2014 08-08-2014
69 Petition No. 140/2014 : Petition for seeking clarification in certain provisions of Joint Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2010 and the Joint Electricity Regulatory Commission (Electricity Supply Code ) first Amendment Regulation, 2013 Petition No. petition no.140/2014 08-08-2014
70 Petition No. 96/2013: ARR and Tariff Determination for FY 2013-14 and True-up for FY 2009-10 & FY 2010-11, Provisional True-up for FY 2011-12 and Review for FY 2012-13. Petition No. 96/2013 for Govt. of Puducherry, Electricity Department, Puducherry Petition No. petition no.96/2013 26-08-2014
71 Petition No. 96/2013: ARR and Tariff Determination for FY 2013-14 and True-up for FY 2009-10 & FY 2010-11, Provisional True-up for FY 2011-12 and Review for FY 2012-13. Petition No. 96/2013 for Govt. of Puducherry, Electricity Department, Puducherry Petition No. petition no.96/2013 28-10-2014
72 Petition No. 145/ 2014 :Petition under Section 62 and 83 (4) of the Electricity Act, 2003 read with chapter-II of the Joint Electricity Regulatory Commission for the State Goa and UTs (Terms and Conditions for determination of Tariff) Regulations, 2009 for approval of Tariff Puducherry Power Corporation Ltd. Gas Power Station (32.5 MW) at Karaikal for the period 2014-15 Petition No. petition no.145/2014 11-11-2014
73 Petition No. 61/2012 : Compliance of Joint Electricity Regulatory Commission for the State of Goa and UTs (Procurement of Renewable Energy) Regulation 2010 regarding Renewable Purchase Obligation (RPO). Petition No. petition no.61/2012 12-11-2014
74 Petition No. 156/ 2014 :Petition under Regulation 60 (c) of JERC (Conduct of Business) Regulations, 2009 for approval of Power Purchase Agreement to be entered into by Electricity Department, Govt of Puducherry with M/s Kudankulam Nuclear Power Project, (KKNPP) NPCIL Petition No. petition no.142/2014 05-01-2015
75 Petition No. 89/2012 : Petition for approval of complete/ actual capital cost of the project and Tariff of the Petitioner- a Power Generating Company - under Regulation 3(2) (a), 3(4),12 and 36 of the JERC for the State of Goa & UTs ( Terms and Conditions for Determination of Tariff) Regulations, 2009 Read with Sections 62(1) (a) and 63 of the Electricity Act, 2003 Petition No. petition no.89/2015 16-03-2015
76 Petition No. 187/ 2015 : Seeking approval / concurrence under Regulation 60 (C) of Joint Electricity Regulatory Commission for the State of Goa & UTs (Conduct of Business) Regulations, 2009 for the Power Purchase Agreement to be entered into by the Electricity Department, Government of Puducherry (EDP) with NLC Thermal Power Station -II (2nd Expansion) (2X500) MW. Petition No. Petition No. 187/2015 Date of Order: 27.11.2015 27-11-2015
77 Petition No. 199/2016 : Seeking approval of Hon'ble Commission for the Implementation of Smart Grid Pilot Project in Puducherry Petition No. Petition No. 199/2016 Date of Order: 25,04.2016 25-04-2016
78 Petition No. 241/2017: Review Petition under Section 94 (1) (f) of the Electricity Act, 2003 read with Section 74 of the JERC (Conduct of Business) Regulations, 2009 seeking review of the Order dated 16.05.2017 in Petition No. 224/2017 and for re-determination of Cross subsidy surcharge as well as the voltage wise wheeling charges levied on Open Access consumers Petition No. 241/2017 10-10-2017
79 Order Petition No. 26/2019: Petition under section 86 (1) (e) of the Electricity Act, 2003 read with Regulation 5(ii) and Regulation 17 of JERC (Solar PV Grid Interactive System based on Net Metering) Regulations, 2019 imploring this Hon’ble Commission to grant approval for signing the open access agreement and to direct the Respondent to exempt the Petitioner from Open Access Restrictions and associated charges including losses, by exercising its power to relax envisaged under the above Regulations. Petition No. Petition No. 26/2019 Date of Hearing: 16.06.2020 Date of Order: 21.09.2020 16-06-2020
80 Order Petition No. 26/2019: Petition under section 86 (1) (e) of the Electricity Act, 2003 read with Regulation 5(ii) and Regulation 17 of JERC (Solar PV Grid Interactive System based on Net Metering) Regulations, 2019 imploring this Hon’ble Commission to grant approval for signing the open access agreement and to direct the Respondent to exempt the Petitioner from Open Access Restrictions and associated charges including losses, by exercising its power to relax envisaged under the above Regulations. Petition No. Petition No. 26/2019 Date of Hearing: 16.06.2020 Date of Order: 18.06.2020 16-06-2020
81 Order Petition No. 28/2019: Power Sale Agreement (PSA) for Sale of 50 MW Wind Power on Long Term Basis. Petition No. petition No.28/2019 18-06-2020
82 Petition No. 28/2019; Power Sale Agreement (PSA) for Sale of 50MW Wind on Long Term basis. Petition No. Petition No. 28/2019 Date of Order: 02.09.2020 03-09-2020
83 Petition No. 46 of 2021 -Relaxation of the Provision 4.4 of the JERC for the State of Goa and Union Territories (Solar PV Grid Interactive System based on Net-Metering) Regulations, 2019, imposing cap on maximum Solar Power Generation Capacity to be installed at Consumer premises. Petition No. Petition No. 46/2021 Date of Hearing: 22.06.2021 Date of Order : 15.07.2021 22-06-2021
84 INTERIM ORDER Petition No. 73/2021 :Petition on behalf of the Petitioner under Section 86(1)(f) read with Sections 142 and 146 of the Electricity Act, 2003, for issuance of appropriate directions in terms thereof, against, the Puducherry Electricity Department (“PED”) for deliberate contravention of the directions passed by this Hon’ble Commission vide its Order dated 21.09.2020 in Case No. 26 of 2019. Petition No. Petition No. 73/2021 Date of Hearing: 04.02.2022 Date of Interim Order: 07.02.202 04-02-2022
85 Petition No. 59/2021:Seeking the approval of the Commission for purchase of 100 MW Solar Power from ISTS Connected Power Projects through M/s NTPC Ltd. and to adopt the tariff as determined through competitive bidding process. Petition No. Petition No. 59/2021 Date of Hearing: 24.02.2022 Date of Order: 31.03.2022 24-02-2023
86 INTERIM ORDER Petition No. 59/2021: Seeking the approval of the Hon'ble Commission for purchase of Solar Power of Capacity 100 MW from ISTS Connected Power Project through M/s. NTPC Ltd and to adopt the price as determined through competitive bidding process and ratify the action taken for signing of power sale agreement (PSA) with M/s. NTPC Ltd in anticipation of approval by Hon'ble Commission Petition No. Petition No. 59/2021 Date of Hearing: 24.02.2022 Date of Order: 28.02.2022 24-02-2022
87 nterim Order Petition No. 73/2021:Petition on behalf of the Petitioner under Section 86(1)(f) read with Sections 142 and 146 of the Electricity Act, 2003, for issuance of appropriate directions in terms thereof, against, the Puducherry Electricity Department (“PED”) for deliberate contravention of the directions passed by this Hon’ble Commission vide its Order dated 21.09.2020 in Case No. 26 of 2019 Petition No. Petition Noti : 73/2021 Date of Hearing : 08ti03ti2022 Date of Interim Order : 09ti03ti2022 08-03-2022
88 Petition No. 73/2021:Petition on behalf of the Petitioner under Section 86(1)(f) read with Sections 142 and 146 of the Electricity Act, 2003, for issuance of appropriate directions in terms thereof, against, the Puducherry Electricity Department (“EDP”) for deliberate contravention of the directions passed by this Hon’ble Commission vide its Order dated 21.09.2020 in Petition No. 26 of 2019 Petition No. Petition No. 73/2021 Date of Hearing: 15.03.2022 Date of Order: 20.05.2022 15-03-2022
89 Order Review Petition No. 82/2022: Review of Tarif Order dated 31.03.2022 issued by the Hon’ble Commission on True-up for FY 2020-21, Annual Performance Review for FY 2021-22 and Aggregate Revenue Requirement (ARR) 3rd Control Period and determination of Retail Tariff for the FY 2022-23 in Petition No. 70/2021 for the Electricity Department, Government of Puducherry Petition No. Review Pettti NtNo 82/2022 Date tf Heariig: 28No07No2022 Date tf Order: 1No08No2022 28-07-2022
90 GENERAL ORDER Petition No. GENERAL ORDER 02-08-2022
91 Petition No. 83/2022: Relaxation of the Provision 4.4 of the JERC for the State of Goa and Union Territories (Solar PV Grid Interactive System based on Net-Metering) Regulations, 2019, imposing cap on maximum Solar Power Generation Capacity to be installed at Consumer premises. Petition No. Review Petition No. 83/2022 Date of Hearing: 27.09.2022 Date of Order: 10.10.2022 27-09-2022
92 Order Suo Moto Petition No. 61/2012: Compliance of Joint Electricity Regulatory Commission (For the state of Goa and Union Territories) (Procurement of Renewable Energy) Regulations, 2010 regarding Renewable Purchase Obligation (RPO) and as amended from time to time. Petition No. suo moto petition no.61/2012 30-11-2022
93 Order Petition No. 83/2022: Relaxation of the Provision 4.4 of the JERC for the State of Goa and Union Territories (Solar PV Grid Interactive System based on Net-Metering) Regulations, 2019, imposing cap on maximum Solar Power Generation Capacity to be installed at Consumer premises. Petition No. petition No.83/2022 15-12-2022
94 INTERIM ORDER Petition No. 108/2023: Review Petition under Regulation 74 (B) of JERC (Conduct of Business) Regulation, 2009 as amended vide JERC (Conduct of Business) (Fourth Amendment Regulation, 2015, w.e.f. 11.02.2015 read with Section 94 (1) (f) of the Electricity Act, 2003 for reviewing the Tariff Order dated 01.08.2023 passed by this Hon'ble Commission in Petition No. 89 of 2022. Petition No. petition No.108/2023,Date of Hearing 26/10/2023,Date of order 31/10/2023 26-10-2023
95 INTERIM ORDER Petition No. 77/2012: Status of Consumer Metering and billing as per Regulation 8 of the Joint Electricity Regulatory Commission (for the State of Goa & Union Territories) (Electricity Supply Code) Regulation, 2018 and as amended from time to time Petition No. Petition No.77/2012,Date of Hearing 06/11/2023,Date of Order 06/11/2023 06-11-2023
96 NTERIM ORDER Petition No. 61/2012: Compliane of the Joint Electricity Regulatory Commission (for the State of Goa & Union Territories) (Procurement of Renewable Energy) Regulations, 2010 regarding Renewable Purchase Obligation (RPO) and as amended from time to time. Petition No. petition No.77/2012 21-11-2023